Design Process Overview

-
AASHTO Soil Classification.
-
Analytical Baseline Analysis.
-
Estimate Starting Soil Mix
Design.
-
Strength Testing and Structural
Design.
-
Treatability Analysis.
-
Final Mix Design Verification
-
Product Structural Design.
Construction Process Overview


-
Materials excavated and
stockpiled.
-
Screen and separate oversize
material from soil.
-
Re-test soil to ensure
material consistency with the sample.
-
Prepare and manage on-site
quality control and safety plans.
-
Set up on-site pug mill(s) and
produce proprietary Emulsified Treated Base ("ETB") at a production rate up to
300 tons per hour per pug mill.
-
Place and compact the ETB in
accordance with acceptable construction practices and the project’s structural
specifications.

|